Visionnaire Collection
A Whirl of Powder Blue and Bronze
Handcrafted in Foshan, the V26 marries cloud-soft sky-blue velvet with a croc-embossed bronze outer shell and a silver-champagne metallic skirt, turning a single swivel chair into a sculpted object of theatre and texture.
Design & Craftsmanship
The seat cocoons you in powder-blue velvet, hand-tufted into slim vertical channels that catch light along every ridge and lend the backrest the rhythm of a fluted column. Its exterior is sheathed in croc-embossed leather-finish bronze, a deliberately architectural counterpoint that reveals itself only as the chair turns, while a piped trim in matching champagne outlines the silhouette with jeweller-like precision. Below, a full silver-champagne metallic velvet skirt flows into a hidden drum swivel, allowing the entire form to rotate smoothly and silently through 360 degrees.
Dimensions
| Width | 82 cm |
| Depth | 85 cm |
| Height | 95 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- A statement vanity seat in a boutique dressing room or master walk-in closet
- An intimate reading nook beside a window, where the swivel invites the eye to follow the light
- A signature accent in a luxury hotel suite, penthouse lounge or haute-couture showroom
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




