Visionnaire Collection
A Sculpture of Crimson Embrace
Handcrafted in Foshan with sculptural Italian flair, the V25 scoop-style lounge armchair envelops the body in deep oxblood velvet, anchored by contrasting light and dark-stained wooden legs and finished with a whisper of metallic trim.
Design & Craftsmanship
The V25 is conceived around a continuous wraparound form that cocoons the sitter in a single, unbroken gesture of curved upholstery. Hand-stitched piped welts trace the perimeter of the scoop, lending precise definition to the silhouette while celebrating the artisanal hand of the maker. Its tapered legs are turned in complementary tones — pale natural ash and a richer dark stain — to create a considered interplay of light and shadow, while a slim metallic base trim introduces a discreet note of architectural refinement.
Dimensions
| Width | 82 cm |
| Depth | 85 cm |
| Height | 95 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Statement seating in a private reading alcove or boutique hotel lounge
- Accent anchoring a moody, jewel-toned living room or library
- Curated corner placement beside a side table and reading lamp
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




