Visionnaire Collection
A Sculptural Trio in Marble and Brass
Handcrafted in Foshan, this trio of round nesting coffee tables unites veined marble and lustrous black lacquer with hand-patinated antique brass, arranging three distinct surfaces in a sculptural, tiered cascade that redefines the centre of a refined interior.
Design & Craftsmanship
Each tier reveals a different facet of luxury through its material: one crowned in dramatic black-and-grey veined marble, another dressed in deep mirror-polished black lacquer, and the third finished in paler white marble with delicate grey veining. Hand-patinated brass rims trace every edge with a softly
✦ CONTINUE READING ✦




