Visionnaire Collection
A fossil-stone slab rests upon a sculpture of ancient texture.
Handcrafted in Foshan, this rectangular coffee table unites a single polished fossil-stone slab with a hand-carved limed-wood base, its crocodile-textured apron and cabriole legs transforming a functional surface into a sculpture of primal elegance.
Design & Craftsmanship
The top is cut from a single slab of petrified marble, its greige and taupe veining revealing millions of years of mineral memory beneath a hand-polished sheen. Beneath it, the limed-wood base is sculpted in our atelier with a deeply chiselled crocodile motif that wraps continuously across the apron and flows into gracefully curved cabriole legs, their organic silhouette softening the table’s generous rectangular footprint.
Dimensions
| Width | 120 cm |
| Depth | 70 cm |
| Height | 42 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Anchoring a contemporary living room with a tactile, gallery-worthy centrepiece
- Displaying curated objects and literature atop a fossil-stone surface of quiet drama
- Elevating animalier-inspired, maximalist or Art Deco interiors with sculptural warmth
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




