V19 Marble & Velvet Tiered Coffee Table

28 8 月, 2026

Visionnaire Collection

A Stratified Symphony of Marble, Brass and Velvet

Handcrafted in Foshan, the V19 unites three cascading marble surfaces, a sculptural brass pedestal and an integrated velvet ottoman into a single modular statement — an Italian-inspired composition that transforms the centre of the room into a stage for stone, silk and shine.

Design & Craftsmanship

Three hand-selected marble tops — veined in cream, dove grey and whisper-soft purple — float at staggered heights within a slender brass armature, their cool translucence balanced by the warmth of hand-lacquered burgundy panels below. A turned cylindrical brass pedestal anchors the composition, lending vertical grace to the otherwise horizontal silhouette. Tucked beneath the lowest tier, a plush dusty-pink velvet ottoman rises directly from the frame, offering a tactile counterpoint to the polished stone and a discreet invitation to linger.

Dimensions

Width 85 cm
Depth 160 cm
Height 85 cm

Customisation

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp