Visionnaire Collection
A Sculptural Centrepiece of Noir Marble and Gilded Veining
Handcrafted in Foshan, the V17 pairs a Sahara Noir marble top laced with golden veining over curved figured wood panels sculpted into a dramatic pinched-waist silhouette, transforming the coffee table into the unmistakable focal point of the room.
Design & Craftsmanship
The rectangular marble slab appears to float above a fluid, saddle-shaped apron where figured mahogany panels curve gracefully inward at the waist before flaring outward toward the plinth — a couture-inspired silhouette that softens the stone’s architectural gravity. A hairline of inlaid brass piping traces the seam between marble and wood, catching the light like fine jewellery, while a twelve-coat hand-polished lacquer lends every surface a deep, liquid shine. Each wood panel is book-matched to honour the natural grain, and the marble is curated slab-by-slab so that no two tables share the same constellation of gold veining.
Dimensions
| Width | 120 cm |
| Depth | 70 cm |
| Height | 42 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Grand living rooms seeking a sculptural, conversation-commanding centrepiece
- Boutique hotel suites, executive lounges and members’ club interiors
-
✦ CONTINUE READING ✦




