Visionnaire Collection
Sculpted bronze meets the hush of smoked glass
Handcrafted in Foshan, this rectangular coffee table pairs a continuous tubular polished bronze base with a smoked bronze-tinted glass top, its sinuous metalwork transforming structural support into the room’s defining sculptural moment.
Design & Craftsmanship
The base is forged from a single continuous tube of polished bronze, bent into twin parallel arches that rise from the floor, curve inward, and descend again — a fluid gesture that reads as both engineering and gesture drawing. A flush, rounded-corner glass top in deep smoked amber rests upon precisely finished mounting points, its tinted surface softening the metal’s mirror shine while echoing bronze’s warm undertone from within. The interplay of solid rod and translucent plane gives the piece its signature tension: weighty yet weightless, industrial yet intimate.
Dimensions
| Width | 120 cm |
| Depth | 70 cm |
| Height | 42 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- A sculptural centrepiece anchoring contemporary living rooms with neutral, earth-toned or jewel-hued palettes
- Statement styling for boutique hotel lobbies, executive suites and private members’ lounges
- Gallery-like interiors and architect-designed residences seeking a singular object of metal and light
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a




