Visionnaire Collection
A Sculpted Statement of Opulence and Heritage
Handcrafted in Foshan, this extra-large three/four-seater luxury sofa marries the romance of cream and ivory leather with the untamed allure of exotic snakeskin, crowned by deep diamond-tufted rolled arms and bespoke monogrammed pillows.
Design & Craftsmanship
The V12 commands the room with English-style rolled arms and a high back, both meticulously hand-tufted in the deep diamond-button tradition that defines old-world luxury. Its lower apron reveals an arresting inlay of dark brown snakeskin, framed by artisanal leather strapping that recalls the equestrian sophistication of bespoke saddlery. Plush monogrammed pillows, finished to your initials, complete a silhouette designed to anchor grand reception halls, private libraries and stately lounges.
Dimensions
| Width | 260 cm |
| Depth | 110 cm |
| Height | 85 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Anchoring a stately formal living room or grand reception lounge
- Commanding the centrepiece of a luxury hotel suite or private club
- Elevating a penthouse salon or executive study with signature presence
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




