Visionnaire Collection
A Sculptural Sanctuary of Leather, Marble and Light
Handcrafted in Foshan, the V11 unites a deeply channel-pleated cream leather chaise with a cantilevered Emperador marble shelving console, forming an L-shaped sectional that reads as both lounge and library for the contemporary collector.
Design & Craftsmanship
The seat is upholstered in supple off-white nappa, drawn across vertical channel pleats that catch the light along every fluted line and lend the cushions a tailored, architectural rhythm. Plush loose back pillows soften the silhouette, while polished chrome framing traces the perimeter and rises into an integrated open shelving console clad in richly veined dark Emperador marble — a feature conceived for displaying objets d’art, folios or crystal decanters with gallery-like poise.
Dimensions
| Width | 260 cm |
| Depth | 110 cm |
| Height | 85 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Anchoring the principal seating area of an open-plan penthouse, where the marble console doubles as a curated display against floor-to-ceiling glazing.
- Furnishing a private library or executive study, offering both generous lounging space and an elegant surface for volumes, decanters and ceremonial objects.
- Defining a luxury hotel suite or members’ lounge, where the channel-pleated leather and veined marble create an immediate sense of Italian-inspired refinement.
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




