V09 Cream Leather Chaise Sectional

28 8 月, 2026

Visionnaire Collection

A Sweeping Curve in Cloud-Soft Leather

Handcrafted in Foshan with the precision of Italian atelier tradition, the V09 marries a sculptural curved silhouette in top-grain aniline leather with an indulgent left chaise — a statement of quiet, modern luxury for the contemporary living room.

Design & Craftsmanship

The V09 is sculpted around a continuous, gently arcing back that invites the eye — and the body — to settle in. Hand-stitched horizontal channel tufting runs across each back cushion, lending rhythm and architectural definition to the cream aniline surface, while softly rounded pillow-edge construction gives the entire piece a buoyant, cloud-like presence. Grounded by slim dark tapered legs, the low-slung profile reads effortlessly elegant from every angle.

Dimensions

Width 260 cm
Depth 110 cm
Height 85 cm

Customisation

Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.

Ideal For

  • Anchoring an open-plan living room where the curved silhouette becomes the focal point
  • Lounging and entertaining in equal measure, with the left chaise offering a generous stretch-out zone
  • Curated interiors seeking a light, sculptural seating statement in neutral palettes

Care & Warranty

Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp