Visionnaire Collection
Sculpted Geometry in a Circle of Ivory
Handcrafted in Foshan, the V07 unites a sweeping circular silhouette in cream ivory leather with cubist 3D block panelling — a couture centrepiece engineered around a polished marble inset and threaded with warm LED backlighting.
Design & Craftsmanship
The V07 is conceived as a continuous ring of seating, its exterior clad in tessellated geometric blocks sculpted with architectural precision and finished in a soft ivory tone that catches the integrated LED glow. Vertical brass rods terminate each panel junction, lending the curved form a jewellery-like rhythm, while a circular polished marble inset anchors the composition at the heart of the sofa.
Dimensions
| Width | 260 cm |
| Depth | 110 cm |
| Height | 85 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Circular conversation lounges and presidential reception suites
- Boutique hotel atriums seeking a sculptural evening-glow centrepiece
- Private villas with grand circular rooms, rotundas or double-height salons
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




