Visionnaire Collection
Sculpted Geometry in Soft Taupe Leather
Handcrafted in Foshan from top-grain taupe leather, this U-shaped sectional reads as a single sculptural object, its faceted geometric panel stitching transforming the outer arm into a piece of architectural jewellery.
Design & Craftsmanship
The outer arm is finished in a sequence of precisely stitched faceted panels that catch light along every angle, lending the sofa the quiet drama of a couture detail. Deep-channel segmented cushions run across the chaise and main seating, creating a rhythmic line of plush, deeply contoured comfort, while a cantilevered side tray table and a built-in central console extend the silhouette into a complete living system ready for unhurried evenings.
Dimensions
| Width | 260 cm |
| Depth | 110 cm |
| Height | 85 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Open-plan living rooms seeking a single statement seating island
- Hosting and entertaining, with the central console and cantilevered tray serving drinks, books and shared plates
- Private media lounges where the U-shaped form wraps around a screen for cinema-style viewing
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




