Visionnaire Collection
A Floating Silhouette in Midnight Velvet and Brushed Gold
Handcrafted in Foshan, this three-seater lounge sofa marries deep midnight-blue velvet with a hand-finished brushed gold plinth base, anchoring any interior with quiet drama and a weightless, floating presence.
Design & Craftsmanship
Generous channel-tufted cushions run the full length of the seat, sculpting the plush high-density foam into rhythmic ridges that catch light across the midnight velvet. The frame is enveloped in fully-upholstered, gently rounded curves, while the exposed metallic gold base appears to lift the entire piece from the floor — an architectural flourish that lends the sofa its signature hovering poise.
Dimensions
| Width | 260 cm |
| Depth | 110 cm |
| Height | 85 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Anchoring a refined hotel lobby, cocktail lounge or private members’ club
- Serving as the statement three-seater in a contemporary penthouse or formal sitting room
- Elevating luxe residential interiors where midnight palette and gold accents set the tone
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




