Visionnaire Collection
A Modular Masterpiece in Sculpted Leather and Marble
Handcrafted in Foshan from supple sand-toned aniline leather with polished brass details and veined marble accents, the V01 sectional transforms contemporary living into an architectural experience defined by ambient LED lighting and bespoke modularity.
Design & Craftsmanship
The V01 exterior is hand-applied with a striking 3D patchwork of geometric tufted panels, each precision-stitched to create a sculpted quilted silhouette that catches and refracts light across its warm camel surface. Beneath the artisanal facade, an integrated system of recessed ambient LEDs casts a gentle, dimmable glow along the sofa’s base, while built-in marble-topped side tables and concealed storage compartments elevate everyday lounging into a seamless blend of form and function. Adjustable cushions rest on a generously proportioned frame, allowing each module to be reconfigured, expanded or repositioned to suit the rhythm of the room.
Dimensions
| Width | 260 cm |
| Depth | 110 cm |
| Height | 85 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Open-plan living rooms seeking a sculptural centerpiece with integrated lighting and storage
- Luxury residences and penthouses where modularity allows the layout to evolve with entertaining and family life
- Boutique hotel suites and executive lounges craving an architectural statement in warm neutral leather
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




