BD-17 Charcoal Executive Swivel Chair

28 8 月, 2026

Bentley Collection

A Study in Charcoal Authority

Handcrafted in Foshan from supple charcoal-grey full-grain leather set upon a polished chrome base, the BD-17 channels the disciplined poise of a grand tourer into an executive swivel chair engineered for long, focused days at the desk.

Design & Craftsmanship

An angular faceted wraparound backrest rises to cradle the shoulders, sculpted to suggest motion even at rest. Integrated leather-wrapped arms flow seamlessly from the seat, while tonal contrast topstitching traces every seam, sharpening the chair’s architectural silhouette. A single plush cushion sits beneath you in full-grain hide, supported by a five-star polished chrome swivel base fitted with smooth-glide casters for considered movement across the boardroom floor.

Dimensions

Width 82 cm
Depth 85 cm
Height 95 cm

Customisation

Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.

Ideal For

  • Private executive study or home office
  • Boardroom or director’s suite
  • High-end corporate workspaces and law firms

Care & Warranty

Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp