Bentley Collection
The Chairman’s Desk — Diamond-Tufted Authority
Handcrafted in Foshan, the BD-16 marries high-gloss lacquered surfaces with deep diamond-quilted leather panelling and sculptural wing legs — a presidential statement built for the corner office.
Design & Craftsmanship
The worktop is finished in a mirror-sheen high-gloss lacquer over dark brown wood, balanced by a tactile black diamond-tufted leather modesty panel hand-stitched in the Bentley tradition. Sculpted aerodynamic wing legs sweep outward from the apron, lending the silhouette a sense of motion even at rest, while an integrated side cabinet conceals files and devices behind a matching lacquered facade.
Dimensions
| Width | 160 cm |
| Depth | 80 cm |
| Height | 75 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Private executive offices and presidential boardrooms
- Law-firm and consulting-firm partner suites
- C-suite studies and luxury home libraries
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




