Bentley Collection
A Sculpture in Espresso Burl and Silken Taupe
Handcrafted in Foshan, the BD-12 pairs cloud-soft light taupe nappa leather with a dramatic dark burl walnut frame, its sculpted crown backrest and wraparound wood panels transforming a dining or accent chair into the room’s quiet centrepiece.
Design & Craftsmanship
The BD-12 is built around a hand-carved burl walnut skeleton, its curved side panels flowing in one continuous line from the top rail into the tapered saber rear legs — a single gesture of joinery that gives the chair its sense of motion. Against this richly figured espresso wood, the light taupe nappa leather is pulled tight and finished with precise contrast piping along every leather-to-wood junction, a quiet detail that accentuates the architectural silhouette of the sculpted crown backrest.
Dimensions
| Width | 82 cm |
| Depth | 85 cm |
| Height | 95 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Head-of-table dining seating in a formal dining room
- Statement occasional chair beside a fireplace or console
- Boutique hotel suites and executive study corners
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




