Bentley Collection
A Centrepiece of Couture Craftsmanship — Where Burl, Leather & Lazy Susan Converge
Handcrafted in Foshan, the BD-10 unites a lustrous dark burl wood surface with a diamond-quilted cream leather pedestal and an integrated rotating lazy susan, channeling the bespoke sophistication of a Bentley interior into the dining room.
Design & Craftsmanship
The circular top is finished in deeply figured dark burl wood, its swirling grain polished to a piano-gloss sheen, while a matching burl lazy susan rotates seamlessly at its centre, framed by polished rose-gold trim rings. Beneath, a sculptural pedestal is upholstered in cream nappa leather and meticulously hand-quilted in a classic diamond motif, anchored by a winged emblem medallion and a broad circular plinth base — a discreet nod to the coachbuilt heritage of the Bentley marque.
Dimensions
| Width | 150 cm |
| Depth | 90 cm |
| Height | 75 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Intimate formal dinner parties where the lazy susan effortlessly shares plates and conversation across the table.
- Executive private dining rooms and Bentley-inspired studies seeking a showpiece that doubles as functional art.
- Circular seating arrangements of six to eight guests, where the rotating centre enhances both ritual and reach.
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




