Bentley Collection
A Sculptural Centrepiece Carved From Nature’s Most Dramatic Veneer
Handcrafted in Foshan, this rectangular coffee table unites a high-gloss burr walnut veneer top with dark lacquered block legs, its theatrical book-matched burl figuring crowning the room with the quiet authority of a continental salon piece.
Design & Craftsmanship
The top is hand-bookmatched from a single burl walnut log, allowing the cascading caramel and honey whorls to mirror each other across the surface in a continuous, fluid composition. Rounded beveled edges soften the rectangular silhouette, while a slim lacquered edge band seals the veneer against time. Below, tall sculptural block legs in deep espresso black lacquer rise with architectural poise, joined to the top without visible hardware for a seamless, monolithic presence.
Dimensions
| Width | 120 cm |
| Depth | 70 cm |
| Height | 42 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Anchor of a refined living room, positioned before a deep sofa as a stage for coffee-table books and objet d’art
- Statement console for a penthouse foyer, hotel lobby or executive lounge where the burl grain can be admired from every angle
- Heritage-inspired library or study, paired with club chairs and tailored drapery to evoke a gentleman’s club atmosphere
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




