Bentley Collection
A Low-Slung Silhouette of Sculpted Elegance
Handcrafted in Foshan, this wide low-profile sofa pairs cream velvet upholstery with a polished hardwood frame, its sculpted flared armrests and floor-skimming skirt defining the Bentley Collection’s signature poise.
Design & Craftsmanship
The frame is built from solid hardwood and finished by hand in a high-gloss lacquer that catches the light along every sweeping curve. Sculpted, outward-flaring armrests are inlaid with slim polished metal strips, lending a tailored couture detail to the timber silhouette. Generously deep-fill cushions sit atop a softly piped seat, while the floor-skimming skirt allows the piece to read as one continuous, unhurried line.
Dimensions
| Width | 260 cm |
| Depth | 110 cm |
| Height | 85 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Grand living rooms and formal drawing rooms in need of an expansive, low-slung seating statement
- Luxury hotel suites, presidential lobbies and executive lounges with generous floor plates
- Open-plan residences where the sofa anchors a long conversational axis beneath pendant lighting
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




