Bentley Collection
A Symphony of Ivory Leather and Macassar Ebony
Handcrafted in Foshan, the BD-03 commands the room with its low-slung Art Deco silhouette, dressed in ivory aniline leather and rising from a high-gloss macassar plinth — a statement piece for collectors of the rare and the refined.
Design & Craftsmanship
Sculpted in the unmistakable geometry of the Jazz Age, the BD-03 is anchored by a piano-finish macassar ebony plinth whose grain catches the light like liquid amber. Deep button-tufted seat cushions meet gently sloping armrests that cascade toward the floor, traced with a slender brass inlay that whispers of the bespoke motorcars that inspired it. The ensemble is finished with grey linen pillows, each diamond-quilted and edged by hand, offering a tailored counterpoint to the sofa’s sweeping horizontal lines.
Dimensions
| Width | 260 cm |
| Depth | 110 cm |
| Height | 85 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, boucle, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Granding the principal lounge of a flagship penthouse or private members’ club
- Anchoring a reception hall where Art Deco architecture calls for a piece of equal pedigree
- Elevating the formal sitting room of a collector’s residence with sculptural, low-profile presence
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




