Fendi Collection
A plush statement bed where warm striped velvet meets cloud-soft bouclé
Handcrafted in Foshan, this king-size platform bed pairs a vertical striped velvet in rich espresso and caramel with a cream bouclé shearling back for a striking dual-texture look. The curved, cocooning headboard and low wraparound base deliver contemporary glamour that anchors the whole bedroom. Full upholstery and a padded frame give it a soft, hotel-suite feel you can sink into.
Design & Craftsmanship
Channel ribbing on the main panels adds rhythm and visual height, while rounded corners soften the silhouette for a plush, enveloping presence. The striped fabric runs continuously across the headboard and platform rails to unify the profile, contrasted by the fuzzy bouclé shearling framing the head. A low platform base keeps the proportions grounded and modern.
Dimensions
| Width | 183 cm |
| Depth | 213 cm |
| Height | 127 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, bouclé, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Master bedroom centrepiece with hotel-luxury styling
- Glamour and modern transitional bedroom schemes
- Pairing with cream and caramel-toned layered bedding
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




