FD10-12 Sunburst Walnut Round Dining Table

28 8 月, 2026

Fendi Collection

A Radiant Sunburst in Deep Walnut

Handcrafted in Foshan, this round dining table features a dramatic eight-panel sunburst top in deep walnut with a high-gloss piano finish. The Art Deco-inspired geometric base adds architectural presence to any dining space.

Design & Craftsmanship

Eight radial walnut segments meet at the centre in a precise sunburst pattern, finished in lustrous piano lacquer. The sculpted, geometrically detailed base provides a bold yet balanced foundation for the table.

Dimensions

Width 160 cm
Depth 160 cm
Height 75 cm

Customisation

Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, bouclé, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.

Ideal For

  • Grand dining rooms
  • Art Deco and glam interiors
  • Upscale restaurants and suites

Care & Warranty

Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp