Fendi Collection
A Swivelling Pumpkin of Plush Bouclé
Handcrafted in Foshan, this rotating lounge chair and ottoman pair is upholstered in warm pumpkin-orange bouclé with a sumptuous, tactile pile. Its rounded, mid-century ball silhouette invites you to swivel and sink into pure relaxation.
Design & Craftsmanship
The sculpted ball seat features petal-style pleated upholstery that wraps the body in softness, while a 360-degree swivel base adds effortless ease. The matching ottoman completes a cosseting set designed for lounging.
Dimensions
| Width | 85 cm |
| Depth | 80 cm |
| Height | 70 cm |
Customisation
Every Rosy Rose piece is made to order. Choose from our full range of premium fabrics and leathers — velvet, bouclé, full-grain and nappa — and tailor the configuration, cushion firmness and finish to your space.
Ideal For
- Cosy reading corners
- Modern lounges and family rooms
- Mid-century style interiors
Care & Warranty
Dust regularly with a soft cloth; avoid prolonged direct sunlight and moisture. Structural frame covered by a 10-year warranty; upholstery by a 2-year warranty.




