ROSY ROSE Foshan Factory · 100,000 m² Showroom

Step Into Our 100,000 m² Factory Showroom

Based in Longjiang, Foshan, our showroom sits directly alongside our production floor. Watch a single hide of leather and a plank of wood turn, step by step, into the furniture you need — direct from the source, with no middlemen.

ROSY ROSE Showroom
Authenticity First

What You See Is
What We Make

Step into a space where craftsmanship meets capability. Physically connected to our production floor, our showroom lets you watch raw materials transform into finished luxury furniture in real time.

100,000 m²Showroom Display Area
2,000+Items on Display
0 kmFactory on Site

Curated Spaces

A Zoned Showroom to Inspire Your Next Project

Thoughtfully staged spaces that showcase the full breadth of our manufacturing capability.

Living Zone
LIVING

Living Zone

Laid out as a real luxury residence. Experience the modular flexibility of our sofa collections staged at true scale in lifelike settings.

Bedroom Zone
BEDROOM

Sleep & Bedroom Zone

Immersive bedroom environments engineered around ergonomics. Test the support and comfort of our upholstered beds and premium mattresses for yourself.

Material Lab
MATERIALS

Material Sample Studio

The heart of customization. Explore our material wall — 100+ Italian leather samples, performance fabrics and wood veneer finishes.

Meeting Lounge
MEETINGS

Business Meeting Lounge

A quiet, private space with coffee service, designed for in-depth project discussions and contract signings.

The Source Factory

From the Showroom to the Production Floor

Our 200,000 m² modern production base sits right next to the showroom. Walk the entire line — from leather cutting and upholstering through assembly and finishing — and see exactly how we control quality.

200,000 m² Production Base 100,000 m² Showroom 16-Step Quality Control
Book a Factory Tour →

Shot On Site

Inside the Showroom

Longjiang, Foshan · 100,000 m² · Visit Us Anytime

Ivory Leather Modular Sectional Sofa Dubai Hotel Project Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory-direct ivory leather modular sectional paired with brushed brass and Calacatta marble coffee table set, engineered for hotel lobby and executive lounge fit-outs. The configuration supports bespoke sectional layouts with sage accent pillows and champagne metal detailing, ideal for villa project contractors and FF&E procurement packages. Bulk wholesale pricing available for Saudi Arabia and GCC regional distribution.

Product: Modular L-shaped sectional sofa with Calacatta marble coffee table set · Material: Top-grain aniline leather upholstery; brushed brass metal base; Calacatta marble lower shelf; bronze smoked glass top · Style: Contemporary luxury / Italian modern palatial · Colour: Ivory cream with sage green accent

B2B audience: Hotel procurement | Interior designer | Contract furniture supplier · Cooperation: Hotel project supply

Keywords: modular l-shaped sectional, ivory modular l-shaped sectional, leather modular l-shaped sectional, italian modern modular l-shaped sectional, modular l-shaped sectional dubai, modular l-shaped sectional riyadh, modular l-shaped sectional doha, modular l-shaped sectional wholesale supplier, modular l-shaped sectional manufacturer china, oem modular l-shaped sectional, private label modular l-shaped sectional, modular l-shaped sectional contract grade, modular l-shaped sectional ff&e procurement, modular l-shaped sectional project quotation, modular l-shaped sectional container loading, modular l-shaped sectional bespoke sizing, manama hotel project supply, dubai project sourcing, cairo project sourcing, muscat ff&e package supply

Video file: PZY_5772.mp4

How do I contact your export team for this collection?
Our export team replies within one business day with the modular l-shaped sectional catalog, tiered pricing and cooperation terms. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
How do I become a dealer for this modular l-shaped sectional?
We appoint one dealer per city for the modular l-shaped sectional range, with annual volume targets, a tiered FOB price list and showroom display support. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
What is the minimum order quantity for this modular l-shaped sectional?
MOQ on the modular l-shaped sectional is 5 sets per model, and mixed-model containers let new dealers open the Dubai market with a low entry order. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
Do you offer OEM or private label on this modular l-shaped sectional?
OEM and private label are our core business: your branding goes on labels, packaging and manuals, and mould ownership transfers on custom modular l-shaped sectional designs. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.

Ivory Leather Sectional Set with Marble Tables Riyadh Hospitality

Original factory footage. (c) 2026 - All Rights Reserved. Factory-produced ivory leather sectional sofa set paired with grey marble and brass coffee tables, staged against a dramatic exotic stone feature wall for hotel project reference. Designed for 5-star hotel suites and executive lounge fit-outs across Mumbai, Riyadh and Doha hospitality markets. Bulk wholesale and OEM private label programs available for regional distributors and commercial developers.

Product: Modular sectional sofa set with marble coffee and side tables · Material: Premium full-grain leather; Patagonia exotic stone slab feature wall; grey Calacatta marble; polished brass framework · Style: Modern Italian luxury with coffered ceiling architecture · Colour: Ivory cream with charcoal grey piping

B2B audience: Hospitality project manager | FF&E procurement | Commercial real estate developer · Cooperation: Contract supply

Keywords: modular sectional sofa, ivory modular sectional sofa, leather modular sectional sofa, modern luxury modular sectional sofa, modular sectional sofa dammam, modular sectional sofa sharjah, modular sectional sofa manama, modular sectional sofa wholesale supplier, modular sectional sofa manufacturer china, oem modular sectional sofa, private label modular sectional sofa, modular sectional sofa contract grade, modular sectional sofa ff&e procurement, modular sectional sofa project quotation, modular sectional sofa container loading, modular sectional sofa bespoke sizing, sharjah project sourcing, muscat bulk wholesale, manama project sourcing, kuwait city project sourcing

Video file: PZY_5774.mp4

Where can I reach a dealer manager about this modular sectional sofa?
Our export team replies within one business day with the modular sectional sofa catalog, tiered pricing and cooperation terms. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Can you customise the dimensions and finish of this modular sectional sofa?
The modular sectional sofa is made to order, so we adjust size, leather grade, stone selection and metal finish to your spec sheet or hotel brand standard. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
What is the lead time for this modular sectional sofa?
Lead time on the modular sectional sofa is 30-45 days after deposit and drawing approval, and repeat container orders into Dammam run faster once tooling is confirmed. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
How do I get your dealer catalog and price list for this modular sectional sofa?
Send your company profile and target market and we issue the dealer pack for the modular sectional sofa, covering catalog, tiered FOB pricing and container loading plans. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.

Curved Italian Sectional Dubai Villa Project Bulk Wholesale

Original factory footage. (c) 2026 - All Rights Reserved. Factory direct crescent-shaped leather sectional in ivory paired with sculptural marble and brass coffee table cluster, channel-tufted daybed, and swivel lounge chair for high-end hospitality. Engineered for hotel chain sourcing, luxury villa fit-outs, and contract furniture supply across GCC and Mumbai markets. Dealer recruitment and regional distribution opportunities available for India, Saudi Arabia and UAE.

Product: Crescent curved sectional sofa with marble coffee table set, daybed and swivel chair · Material: Aniline-dyed full-grain leather; Calacatta marble tops; polished brass pedestals; oxblood velvet accent · Style: Contemporary Italian palatial luxury with sculptural forms · Colour: Ivory cream with burgundy oxblood accent

B2B audience: Interior design studio | Hotel chain sourcing | Villa project contractor · Cooperation: Bulk wholesale

Keywords: crescent curved sectional, ivory crescent curved sectional, leather crescent curved sectional, italian palatial crescent curved sectional, crescent curved sectional doha, crescent curved sectional kuwait city, crescent curved sectional abu dhabi, crescent curved sectional wholesale supplier, crescent curved sectional manufacturer china, oem crescent curved sectional, private label crescent curved sectional, crescent curved sectional contract grade, crescent curved sectional ff&e procurement, crescent curved sectional project quotation, crescent curved sectional container loading, crescent curved sectional bespoke sizing, dubai hospitality fit out, riyadh ff&e package supply, cairo dealer programme, dammam private label supply

Video file: PZY_5775.mp4

What is the fastest way to get a quotation for this crescent curved sectional?
Our export team replies within one business day with the crescent curved sectional catalog, tiered pricing and cooperation terms. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
Do you ship this crescent curved sectional to Saudi Arabia, the UAE and the wider GCC?
Yes - the crescent curved sectional ships into Doha and the wider GCC on weekly consolidation, with DDP options to your warehouse door. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
What payment terms do you accept on this crescent curved sectional?
Standard terms on the crescent curved sectional are 30% T/T deposit with the balance against B/L copy; L/C at sight is available for first orders. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Are samples of this crescent curved sectional available before a bulk order?
A single crescent curved sectional sample ships in 10-15 days, and the sample charge is credited back against your first container order. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.

Italian Modern Sofa Set Mumbai Dealer Franchise Opportunity

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced ivory leather sectional with piano black lacquer coffee tables and burgundy velvet accent chair, paired with sculptural brass geometric chandelier. Designed for high-end hotel procurement, luxury residential developer projects, and franchise showroom operators across Mumbai and GCC markets. Regional agent and bulk wholesale distribution programs open.

Product: Modular sectional sofa set with sculptural glossy black coffee table and brass chandelier · Material: Aniline leather upholstery; high-gloss piano black lacquer; brushed brass metal frame; velvet armchair accent · Style: Modern Italian glamour with art deco sculptural forms · Colour: Ivory cream with burgundy oxblood accent

B2B audience: Furniture dealer | Hotel procurement | Interior designer · Cooperation: Franchise

Keywords: modular sectional sofa set, ivory modular sectional sofa set, leather modular sectional sofa set, art deco modular sectional sofa set, modular sectional sofa set manama, modular sectional sofa set amman, modular sectional sofa set cairo, modular sectional sofa set wholesale supplier, modular sectional sofa set manufacturer china, oem modular sectional sofa set, private label modular sectional sofa set, modular sectional sofa set contract grade, modular sectional sofa set ff&e procurement, modular sectional sofa set project quotation, modular sectional sofa set container loading, modular sectional sofa set bespoke sizing, abu dhabi project sourcing, sharjah bulk wholesale, abu dhabi contract supply, doha oem production

Video file: PZY_5776.mp4

How do I start cooperation on this modular sectional sofa set with your factory?
Our export team replies within one business day with the modular sectional sofa set catalog, tiered pricing and cooperation terms. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
What warranty covers this modular sectional sofa set?
The modular sectional sofa set carries a 10-year structural warranty and 2-year surface finish warranty, plus a written parts supply commitment. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Do you provide full FF&E packages built around this modular sectional sofa set?
We supply room-type FF&E packages around the modular sectional sofa set, covering seating, casegoods, tables and lighting to your schedule and budget per key. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
How do interior designers and specifiers work with you on this modular sectional sofa set?
We release CAD drawings, 3D renders, material samples and spec sheets for the modular sectional sofa set so studios can drop it straight into their drawing set. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.

Verde Marble Coffee Table Set Doha Hotel Procurement Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory engineered curved ivory leather sectional paired with verde alpi marble triangular and round coffee tables on fluted black pedestals, staged against dark charcoal feature wall. Suited to hotel lobby and penthouse specification work for commercial developers, FF&E specifiers, and hospitality project procurement teams. Regional distribution and bulk wholesale programs active across GCC and Mumbai.

Product: Curved modular sectional sofa with verde alpi marble coffee table set · Material: Top-grain leather; verde alpi green marble; black fluted lacquered pedestal; brass metal accents · Style: Italian contemporary luxury with sculptural organic forms · Colour: Ivory cream with forest green marble accent

B2B audience: Specifier | Hotel procurement | Contract furniture supplier · Cooperation: Regional distribution

Keywords: curved modular sectional, ivory curved modular sectional, leather curved modular sectional, contemporary luxury curved modular sectional, curved modular sectional abu dhabi, curved modular sectional jeddah, curved modular sectional muscat, curved modular sectional wholesale supplier, curved modular sectional manufacturer china, oem curved modular sectional, private label curved modular sectional, curved modular sectional contract grade, curved modular sectional ff&e procurement, curved modular sectional project quotation, curved modular sectional container loading, curved modular sectional bespoke sizing, amman private label supply, riyadh hospitality fit out, kuwait city franchise supply, sharjah oem production

Video file: PZY_5777.mp4

Who handles dealer enquiries for this curved modular sectional?
Our export team replies within one business day with the curved modular sectional catalog, tiered pricing and cooperation terms. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Are you exhibiting this curved modular sectional at international furniture fairs?
We exhibit at Canton Fair, the Shanghai furniture fair and INDEX Dubai, and arrange private curved modular sectional viewings around those dates. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
What is your monthly production capacity for this curved modular sectional?
Our Foshan plant ships 20+ forty-foot containers a month, so curved modular sectional schedules hold even across multi-room hotel rollouts. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
How do franchise partners operate in my region on this curved modular sectional?
Franchise partners on the curved modular sectional hold regional exclusivity against an agreed annual volume and receive the brand environment, display plan and staff training. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.

Calacatta Marble Nesting Tables Abu Dhabi Hotel Project Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced ivory aniline leather U-shaped sectional with charcoal piping, Calacatta marble nesting coffee tables, and boucle accent armchairs, staged within a Corinthian column showroom. Engineered for hotel project supply, commercial real estate developer fit-outs, and architect-led interior specifications across GCC, Mumbai and North Africa. Dealer recruitment and OEM private label available.

Product: U-shaped sectional sofa with Calacatta marble nesting coffee tables and boucle armchairs · Material: Aniline leather upholstery; Calacatta marble tops; brushed brass pedestal bases; boucle fabric accent · Style: Italian palatial neoclassical revival with Corinthian column architecture · Colour: Ivory cream with charcoal contrast piping

B2B audience: Architect | Interior designer | Commercial real estate developer · Cooperation: Hotel project supply

Keywords: u-shaped sectional sofa, ivory u-shaped sectional sofa, leather u-shaped sectional sofa, neoclassical u-shaped sectional sofa, u-shaped sectional sofa cairo, u-shaped sectional sofa dubai, u-shaped sectional sofa riyadh, u-shaped sectional sofa wholesale supplier, u-shaped sectional sofa manufacturer china, oem u-shaped sectional sofa, private label u-shaped sectional sofa, u-shaped sectional sofa contract grade, u-shaped sectional sofa ff&e procurement, u-shaped sectional sofa project quotation, u-shaped sectional sofa container loading, u-shaped sectional sofa bespoke sizing, sharjah hotel project supply, riyadh oem production, doha hospitality fit out, dubai ff&e package supply

Video file: PZY_5779.mp4

How can a distributor reach your export desk about this u-shaped sectional sofa?
Our export team replies within one business day with the u-shaped sectional sofa catalog, tiered pricing and cooperation terms. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
Can this u-shaped sectional sofa be built to hotel chain brand standards?
We manufacture the u-shaped sectional sofa to Marriott, Hilton, Accor and IHG style guides, including tolerances, contract-grade upholstery and moisture-rated finishes. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
What materials are used in this u-shaped sectional sofa?
The u-shaped sectional sofa is built in ivory tones with leather, solid hardwood frames and hand-applied finishes - full material data sheet on request. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Is installation support provided for project orders of this u-shaped sectional sofa?
Project orders of the u-shaped sectional sofa include installation drawings and hardware schedules, plus on-site supervision on large rollouts. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.

Brass Sputnik Chandelier Riyadh Hotel Lobby Bulk Wholesale

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced sputnik-style frosted glass chandelier in brass, paired with curved ivory leather sectional and Calacatta marble nesting tables for hotel lobby installations. Suited to lighting specifiers, hospitality project managers, and hotel procurement teams across Riyadh, Mumbai and the wider GCC. Bulk wholesale distribution and franchise showroom opportunities open.

Product: Sputnik frosted glass chandelier with curved sectional sofa and marble nesting tables · Material: Polished brass and hand-blown frosted glass; ivory leather upholstery; Calacatta marble; brass plinth bases · Style: Italian palatial with mid-century modern sputnik lighting · Colour: Champagne gold with ivory cream

B2B audience: Lighting specifier | Hospitality project manager | Hotel procurement · Cooperation: Bulk wholesale

Keywords: sputnik frosted glass, champagne sputnik frosted glass, leather sputnik frosted glass, italian palatial sputnik frosted glass, sputnik frosted glass muscat, sputnik frosted glass dammam, sputnik frosted glass sharjah, sputnik frosted glass wholesale supplier, sputnik frosted glass manufacturer china, oem sputnik frosted glass, private label sputnik frosted glass, sputnik frosted glass contract grade, sputnik frosted glass ff&e procurement, sputnik frosted glass project quotation, sputnik frosted glass container loading, sputnik frosted glass bespoke sizing, dammam hotel project supply, riyadh hotel project supply, muscat private label supply, amman oem production

Video file: PZY_5780.mp4

What is the best way to contact you about wholesale supply of this sputnik frosted glass?
Our export team replies within one business day with the sputnik frosted glass catalog, tiered pricing and cooperation terms. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
Which certifications cover this sputnik frosted glass?
The sputnik frosted glass is produced under ISO 9001 with CE, CARB P2 and FSC documentation issued per order for customs and tender files. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
How is this sputnik frosted glass packaged for international shipping?
The sputnik frosted glass is EPE-wrapped, foam-cornered and crated in export-grade plywood with desiccant, then loaded under a photo loading report. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
What HS code applies to this sputnik frosted glass for customs clearance?
Upholstered seating clears under HS 9401.61/9401.71 and casegoods under HS 9403.20; the sputnik frosted glass ships with the full invoice set. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.

Tufted Chesterfield Sofa Mumbai FF&E Contract Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced ivory Chesterfield-style sofa with deep button tufting, paired with round marble and brass nesting coffee tables against burl walnut paneling. Engineered for hotel procurement, FF&E contract supply, and commercial developer lounge fit-outs across Mumbai, GCC and Saudi Arabia. Regional agent and bulk wholesale distribution available.

Product: Chesterfield tufted sofa with marble and brass nesting coffee table set · Material: Top-grain leather with hand-tufted capitonne detailing; Carrara marble tops; brass and black lacquer; burl walnut paneling · Style: Contemporary luxury / Modern Chesterfield revival · Colour: Ivory cream with warm walnut tones

B2B audience: FF&E procurement | Hotel procurement | Commercial real estate developer · Cooperation: Contract supply

Keywords: chesterfield tufted sofa, ivory chesterfield tufted sofa, leather chesterfield tufted sofa, contemporary luxury chesterfield tufted sofa, chesterfield tufted sofa riyadh, chesterfield tufted sofa doha, chesterfield tufted sofa kuwait city, chesterfield tufted sofa wholesale supplier, chesterfield tufted sofa manufacturer china, oem chesterfield tufted sofa, private label chesterfield tufted sofa, chesterfield tufted sofa contract grade, chesterfield tufted sofa ff&e procurement, chesterfield tufted sofa project quotation, chesterfield tufted sofa container loading, chesterfield tufted sofa bespoke sizing, doha bulk wholesale, sharjah private label supply, manama contract supply, abu dhabi franchise supply

Video file: PZY_5781.mp4

How do I request the dealer pack for this chesterfield tufted sofa?
Our export team replies within one business day with the chesterfield tufted sofa catalog, tiered pricing and cooperation terms. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Do you offer regional exclusivity for distributors of this chesterfield tufted sofa?
Exclusivity on the chesterfield tufted sofa is granted per country or city against a defined annual volume, protecting your stock, showroom and marketing investment. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
How do I arrange a factory visit to see this chesterfield tufted sofa in Foshan?
Send your travel dates and we arrange airport pickup, a full line tour and chesterfield tufted sofa testing at our Foshan workshop. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
What is the price range for this chesterfield tufted sofa at project volume?
Indicative FOB on the chesterfield tufted sofa runs USD 350-3,500 per piece by size, stone content and upholstery grade, with project pricing at volume. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.

Crystal Ribbon Chandelier Dubai Hotel Project Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced ribbon-loop crystal chandelier with crushed glass and brass canopy, paired with forest green leather and ivory velvet sofa collection for statement hotel atriums. Designed for hotel chain sourcing, lighting specifier projects, and luxury interior designer commissions across Dubai, Doha, Mumbai and GCC. Bulk wholesale and OEM private label programs available.

Product: Sculptural ribbon-loop crystal chandelier with leather sofa collection · Material: Crushed crystal and fragmented mirrored glass; champagne brass canopy; forest green leather; ivory velvet upholstery · Style: Contemporary luxury / Modern sculptural lighting · Colour: Champagne gold with forest green and ivory

B2B audience: Lighting specifier | Interior designer | Hotel chain sourcing · Cooperation: Hotel project supply

Keywords: sculptural ribbon-loop crystal, champagne sculptural ribbon-loop crystal, leather sculptural ribbon-loop crystal, contemporary luxury sculptural ribbon-loop crystal, sculptural ribbon-loop crystal sharjah, sculptural ribbon-loop crystal manama, sculptural ribbon-loop crystal amman, sculptural ribbon-loop crystal wholesale supplier, sculptural ribbon-loop crystal manufacturer china, oem sculptural ribbon-loop crystal, private label sculptural ribbon-loop crystal, sculptural ribbon-loop crystal contract grade, sculptural ribbon-loop crystal ff&e procurement, sculptural ribbon-loop crystal project quotation, sculptural ribbon-loop crystal container loading, sculptural ribbon-loop crystal bespoke sizing, jeddah dealer programme, doha franchise supply, muscat oem production, kuwait city dealer programme

Video file: PZY_5782.mp4

Which channel do you use for B2B enquiries on this sculptural ribbon-loop crystal?
Our export team replies within one business day with the sculptural ribbon-loop crystal catalog, tiered pricing and cooperation terms. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
Do you provide 3D models or BIM files for this sculptural ribbon-loop crystal?
Yes - SketchUp, 3ds Max and IFC/BIM files for the sculptural ribbon-loop crystal ship with material schedules so specifiers can close their documentation package. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
How is quality control handled on this sculptural ribbon-loop crystal?
Every sculptural ribbon-loop crystal order runs three-stage inspection - incoming material, in-process frame check and pre-shipment load test - with a photo report before dispatch. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
What is the FOB port for this sculptural ribbon-loop crystal?
FOB Shenzhen or Guangzhou/Nansha is standard for the sculptural ribbon-loop crystal, with CIF, CFR and DDP quotes issued on request. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.

Bronze Octagonal Coffee Table Abu Dhabi Hospitality Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced black aniline leather sectional sofa paired with faceted bronze octagonal coffee table and agate geode side table on brass tripod, staged with zebra accent chairs. Suited to hospitality project managers, luxury interior designers, and hotel procurement teams for executive lounge and bar fit-outs across Abu Dhabi, GCC and Mumbai markets. Bulk wholesale distribution and OEM private label programs available.

Product: Black leather sectional sofa with octagonal bronze coffee table and agate side table · Material: Full-grain aniline leather; bronze metalwork; agate geode slab top; brass tripod base · Style: Art Deco contemporary luxury with animalier accents · Colour: Charcoal black with bronze gold and zebra print

B2B audience: Hospitality project manager | Interior designer | Hotel procurement · Cooperation: Bulk wholesale

Keywords: black leather sectional, charcoal black leather sectional, leather black leather sectional, art deco black leather sectional, black leather sectional kuwait city, black leather sectional abu dhabi, black leather sectional jeddah, black leather sectional wholesale supplier, black leather sectional manufacturer china, oem black leather sectional, private label black leather sectional, black leather sectional contract grade, black leather sectional ff&e procurement, black leather sectional project quotation, black leather sectional container loading, black leather sectional bespoke sizing, dammam oem production, amman bulk wholesale, dubai oem production, doha dealer programme

Video file: PZY_5783.mp4

How do I speak with your contract projects team about this black leather sectional?
Our export team replies within one business day with the black leather sectional catalog, tiered pricing and cooperation terms. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
Can this black leather sectional ship in a mixed-product container load?
We combine seating, tables, casegoods and lighting with the black leather sectional in one container, so you carry a full assortment at single-item shipping cost. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
How do I request a quotation on this black leather sectional for a villa or project?
Send the floor plan or BOQ and we return a room-by-room quotation on the black leather sectional with drawings, lead time and container plan within 48 hours. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
Do you support DDP shipping of this black leather sectional to my country?
DDP on the black leather sectional into Kuwait City is quoted door to door with duties and clearance handled, the preferred route for regional distributors. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.

Saffron Velvet Crescent Sofa Doha Hotel Project Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced oversized saffron velvet crescent sectional with brass nailhead trim and braided piping, paired with glossy black and brass coffee tables and animal print accents for dramatic hotel lobby impact. Designed for interior design studios, hotel procurement, and hospitality project manager commissions across Doha, GCC and Mumbai. Bulk wholesale and dealer recruitment available.

Product: Saffron velvet curved crescent sectional sofa with brass nailhead trim · Material: Premium velvet upholstery; polished brass nailhead trim; brass base coffee tables; leather accents · Style: Italian contemporary glamour with art deco influences · Colour: Saffron marigold amber

B2B audience: Interior design studio | Hotel procurement | Hospitality project manager · Cooperation: Hotel project supply

Keywords: saffron velvet curved, saffron saffron velvet curved, leather saffron velvet curved, art deco saffron velvet curved, saffron velvet curved amman, saffron velvet curved cairo, saffron velvet curved dubai, saffron velvet curved wholesale supplier, saffron velvet curved manufacturer china, oem saffron velvet curved, private label saffron velvet curved, saffron velvet curved contract grade, saffron velvet curved ff&e procurement, saffron velvet curved project quotation, saffron velvet curved container loading, saffron velvet curved bespoke sizing, cairo franchise supply, dammam franchise supply, abu dhabi private label supply, amman contract supply

Video file: PZY_5784.mp4

Can I message you on WhatsApp about this saffron velvet curved?
Our export team replies within one business day with the saffron velvet curved catalog, tiered pricing and cooperation terms. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Are replacement parts available for this saffron velvet curved long term?
We guarantee a 5-year parts supply on the saffron velvet curved, so showroom samples and delivered projects stay serviceable. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
What is the MOQ for a custom colour or finish on this saffron velvet curved?
Custom colour and finish MOQ on the saffron velvet curved is 10 sets per model, while stock leather selections ship from 5 sets. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
How do I become a regional brand agent for this saffron velvet curved?
We appoint saffron velvet curved agents by territory under a signed agreement with protected pricing and marketing material in your market language. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.

Ivory Leather Sectional Riyadh Hospitality Contract Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced low-profile ivory leather sectional with oversized plush back cushions, dalmatian accent pillow, and fluted brass-inlay wall paneling for refined hotel suite specifications. Engineered for FF&E procurement, interior designer, and hospitality project manager fit-outs across Riyadh, GCC and Mumbai. OEM private label and bulk wholesale supply available.

Product: Low-profile ivory leather sectional sofa with fluted brass wall paneling · Material: Full-grain Italian leather upholstery; fluted wall paneling with brass inlay; gold accent metalwork · Style: Contemporary luxury / Italian palatial minimalist · Colour: Ivory cream with champagne gold

B2B audience: FF&E procurement | Interior designer | Hospitality project manager · Cooperation: Contract supply

Keywords: low-profile ivory leather, ivory low-profile ivory leather, leather low-profile ivory leather, contemporary luxury low-profile ivory leather, low-profile ivory leather jeddah, low-profile ivory leather muscat, low-profile ivory leather dammam, low-profile ivory leather wholesale supplier, low-profile ivory leather manufacturer china, oem low-profile ivory leather, private label low-profile ivory leather, low-profile ivory leather contract grade, low-profile ivory leather ff&e procurement, low-profile ivory leather project quotation, low-profile ivory leather container loading, low-profile ivory leather bespoke sizing, kuwait city oem production, jeddah oem production, cairo contract supply, abu dhabi dealer programme

Video file: PZY_5788.mp4

How do I open a dealer account for this low-profile ivory leather?
Our export team replies within one business day with the low-profile ivory leather catalog, tiered pricing and cooperation terms. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
Do you provide showroom mockup design around this low-profile ivory leather?
We deliver 2D layout and 3D mockup drawings, then supply the low-profile ivory leather display pieces, lighting plan and signage specification. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
Which hospitality projects feature a piece like this low-profile ivory leather?
We have supplied 5-star hotel, resort and restaurant fit-outs across the GCC, Africa and Southeast Asia; names on this low-profile ivory leather release under NDA on request. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Can this low-profile ivory leather be specified for restaurant and F&B fit-out projects?
Yes - the low-profile ivory leather can be built contract-grade with stain-, heat- and moisture-resistant finishes for high-traffic venues. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.

Marquetry Dining Table Mumbai Hotel Project Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced rectangular dining table with high-gloss geometric marquetry top and black lacquer base, accompanied by six two-tone leather chairs with curved backs and brass foot caps. Engineered for hotel project supply, hospitality project manager specifications, and FF&E procurement across Mumbai, Riyadh, Doha and GCC. Bulk wholesale distribution and dealer recruitment open.

Product: Rectangular dining table set with six two-tone leather chairs · Material: High-gloss lacquered geometric marquetry top; black lacquered base; two-tone leather chairs; brass-tipped feet · Style: Modern Italian art deco glamour · Colour: Burgundy oxblood with cream ivory

B2B audience: Hospitality project manager | Interior designer | FF&E procurement · Cooperation: Hotel project supply

Keywords: rectangular dining table, burgundy rectangular dining table, leather rectangular dining table, art deco rectangular dining table, rectangular dining table dubai, rectangular dining table riyadh, rectangular dining table doha, rectangular dining table wholesale supplier, rectangular dining table manufacturer china, oem rectangular dining table, private label rectangular dining table, rectangular dining table contract grade, rectangular dining table ff&e procurement, rectangular dining table project quotation, rectangular dining table container loading, rectangular dining table bespoke sizing, kuwait city hospitality fit out, abu dhabi ff&e package supply, dubai bulk wholesale, muscat hotel project supply

Video file: PZY_5790.mp4

Where do I send an enquiry about hotel project supply of this rectangular dining table?
Our export team replies within one business day with the rectangular dining table catalog, tiered pricing and cooperation terms. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
How do I contact your export sales team about this rectangular dining table?
Our export desk answers within one business day with the rectangular dining table catalog, pricing and cooperation terms. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Is showroom viewing of this rectangular dining table available in Dubai or Riyadh?
Partner showrooms in Dubai and Riyadh hold rectangular dining table samples, and we arrange dedicated viewings around INDEX and hotel procurement weeks. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
How do I become a dealer for this rectangular dining table?
We appoint one dealer per city for the rectangular dining table range, with annual volume targets, a tiered FOB price list and showroom display support. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.

Backlit Onyx Wall Sofa Jeddah Hotel Procurement Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory engineered ivory leather modular sectional paired with grey marble and brass coffee tables, staged against a dramatic backlit onyx feature wall with dark paneled surround. Suited to hotel procurement, FF&E specification, and commercial real estate developer fit-outs for 5-star suites and executive lounges across Jeddah, GCC and Mumbai. Bulk wholesale and OEM private label available.

Product: Modular sectional sofa with marble and brass coffee tables against backlit onyx wall · Material: Top-grain aniline leather; grey marble top; polished brass frame; backlit onyx slab feature wall · Style: Italian contemporary luxury with palatial modern accents · Colour: Ivory cream with taupe beige

B2B audience: Hotel procurement | FF&E procurement | Commercial real estate developer · Cooperation: Hotel project supply

Keywords: modular sectional sofa with, ivory modular sectional sofa with, leather modular sectional sofa with, contemporary luxury modular sectional sofa with, modular sectional sofa with dammam, modular sectional sofa with sharjah, modular sectional sofa with manama, modular sectional sofa with wholesale supplier, modular sectional sofa with manufacturer china, oem modular sectional sofa with, private label modular sectional sofa with, modular sectional sofa with contract grade, modular sectional sofa with ff&e procurement, modular sectional sofa with project quotation, modular sectional sofa with container loading, modular sectional sofa with bespoke sizing, sharjah franchise supply, muscat project sourcing, muscat contract supply, riyadh franchise supply

Video file: PZY_5791.mp4

How do I get a price list for this modular sectional sofa with?
Our export team replies within one business day with the modular sectional sofa with catalog, tiered pricing and cooperation terms. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
What is the minimum order quantity for this modular sectional sofa with?
MOQ on the modular sectional sofa with is 5 sets per model, and mixed-model containers let new dealers open the Dammam market with a low entry order. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
Do you offer OEM or private label on this modular sectional sofa with?
OEM and private label are our core business: your branding goes on labels, packaging and manuals, and mould ownership transfers on custom modular sectional sofa with designs. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
Can you customise the dimensions and finish of this modular sectional sofa with?
The modular sectional sofa with is made to order, so we adjust size, leather grade, stone selection and metal finish to your spec sheet or hotel brand standard. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.

Marble Executive Desk Riyadh Office Project Contract Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced sculptural executive desk with book-matched Calacatta-style marble top, quilted cream upholstered pedestal, and backlit onyx panel on brass uprights, paired with channel-tufted ivory leather office chair. Engineered for office project contractor specifications, interior designer executive suite projects, and hospitality manager fit-outs across Riyadh, GCC and Mumbai. Bulk wholesale and OEM private label programs available.

Product: Executive sculptural office desk with marble top and tufted office chair · Material: Book-matched marble desktop; quilted cream upholstered base; polished brass uprights; backlit onyx panel; channel-tufted leather chair · Style: Contemporary luxury / Italian palatial executive · Colour: Champagne cream with brass gold

B2B audience: Office project contractor | Interior designer | Hospitality project manager · Cooperation: Contract supply

Keywords: executive sculptural office, champagne executive sculptural office, leather executive sculptural office, contemporary luxury executive sculptural office, executive sculptural office doha, executive sculptural office kuwait city, executive sculptural office abu dhabi, executive sculptural office wholesale supplier, executive sculptural office manufacturer china, oem executive sculptural office, private label executive sculptural office, executive sculptural office contract grade, executive sculptural office ff&e procurement, executive sculptural office project quotation, executive sculptural office container loading, executive sculptural office bespoke sizing, amman ff&e package supply, muscat dealer programme, doha hotel project supply, dammam hospitality fit out

Video file: PZY_5792.mp4

What is your export desk contact for GCC buyers of this executive sculptural office?
Our export team replies within one business day with the executive sculptural office catalog, tiered pricing and cooperation terms. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
What is the lead time for this executive sculptural office?
Lead time on the executive sculptural office is 30-45 days after deposit and drawing approval, and repeat container orders into Doha run faster once tooling is confirmed. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
How do I get your dealer catalog and price list for this executive sculptural office?
Send your company profile and target market and we issue the dealer pack for the executive sculptural office, covering catalog, tiered FOB pricing and container loading plans. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Do you ship this executive sculptural office to Saudi Arabia, the UAE and the wider GCC?
Yes - the executive sculptural office ships into Doha and the wider GCC on weekly consolidation, with DDP options to your warehouse door. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.

Greige Leather Sectional Abu Dhabi Hotel Bulk Wholesale

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced modular greige leather sectional with deep seats, dark Emperador marble coffee table, walnut frame accent armchair and brass detailing for refined hospitality lounge specifications. Engineered for hotel procurement, interior designer, and FF&E procurement projects across Abu Dhabi, GCC and Mumbai markets. Bulk wholesale distribution and dealer recruitment available.

Product: Modular greige leather sectional sofa with marble coffee table and accent armchair · Material: Top-grain leather upholstery; Emperador dark marble top; walnut and brass base; performance fabric armchair · Style: Contemporary luxury / Italian modern minimalist · Colour: Warm taupe greige with espresso walnut

B2B audience: Hotel procurement | Interior designer | FF&E procurement · Cooperation: Bulk wholesale

Keywords: modular greige leather, warm modular greige leather, leather modular greige leather, italian modern modular greige leather, modular greige leather manama, modular greige leather amman, modular greige leather cairo, modular greige leather wholesale supplier, modular greige leather manufacturer china, oem modular greige leather, private label modular greige leather, modular greige leather contract grade, modular greige leather ff&e procurement, modular greige leather project quotation, modular greige leather container loading, modular greige leather bespoke sizing, dubai private label supply, riyadh private label supply, dubai dealer programme, amman dealer programme

Video file: PZY_5793.mp4

How do I arrange cooperation as a regional agent for this modular greige leather?
Our export team replies within one business day with the modular greige leather catalog, tiered pricing and cooperation terms. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
What payment terms do you accept on this modular greige leather?
Standard terms on the modular greige leather are 30% T/T deposit with the balance against B/L copy; L/C at sight is available for first orders. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Are samples of this modular greige leather available before a bulk order?
A single modular greige leather sample ships in 10-15 days, and the sample charge is credited back against your first container order. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
What warranty covers this modular greige leather?
The modular greige leather carries a 10-year structural warranty and 2-year surface finish warranty, plus a written parts supply commitment. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.

Round Marble Dining Table Doha Hotel Project Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced round Calacatta marble dining table with rotating lazy Susan, fluted black lacquer pedestal and brass trim, paired with channel-tufted ivory leather barrel-back dining chairs with brass sabots. Engineered for hospitality project manager specifications, hotel procurement, and interior designer luxury suites across Doha, GCC and Mumbai. OEM private label and bulk wholesale programs available.

Product: Round Calacatta marble dining table with lazy Susan and ivory leather tufted chairs · Material: Italian Calacatta marble top; high-gloss black fluted pedestal; brass trim; ivory channel-tufted leather; brass foot caps · Style: Modern luxury / Italian art deco revival · Colour: White marble with ivory cream

B2B audience: Hospitality project manager | Hotel procurement | Interior designer · Cooperation: Hotel project supply

Keywords: round calacatta marble, white round calacatta marble, leather round calacatta marble, art deco round calacatta marble, round calacatta marble abu dhabi, round calacatta marble jeddah, round calacatta marble muscat, round calacatta marble wholesale supplier, round calacatta marble manufacturer china, oem round calacatta marble, private label round calacatta marble, round calacatta marble contract grade, round calacatta marble ff&e procurement, round calacatta marble project quotation, round calacatta marble container loading, round calacatta marble bespoke sizing, riyadh dealer programme, amman hotel project supply, doha private label supply, kuwait city contract supply

Video file: PZY_5794.mp4

Who do I contact about OEM production of this round calacatta marble?
Our export team replies within one business day with the round calacatta marble catalog, tiered pricing and cooperation terms. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Do you provide full FF&E packages built around this round calacatta marble?
We supply room-type FF&E packages around the round calacatta marble, covering seating, casegoods, tables and lighting to your schedule and budget per key. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
How do interior designers and specifiers work with you on this round calacatta marble?
We release CAD drawings, 3D renders, material samples and spec sheets for the round calacatta marble so studios can drop it straight into their drawing set. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
Are you exhibiting this round calacatta marble at international furniture fairs?
We exhibit at Canton Fair, the Shanghai furniture fair and INDEX Dubai, and arrange private round calacatta marble viewings around those dates. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.

Marble Inlay Dining Set Mumbai Hospitality Contract Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced rectangular dining table with geometric marble inlay and brass detailing, accompanied by six ivory button-tufted leather chairs with curved black lacquer frames and brass caps, finished with cascading glass pendant chandelier. Designed for hotel procurement, hospitality project manager, and interior designer specifications across Mumbai, Riyadh and GCC. Bulk wholesale distribution and dealer recruitment available.

Product: Rectangular marble inlay dining table set with six tufted leather chairs and glass pendant chandelier · Material: Geometric marble inlay top; polished brass and stainless steel frame; ivory button-tufted leather chairs; brass sabots; hand-blown frosted glass pendants · Style: Modern luxury / Italian art deco glamour · Colour: Black charcoal with champagne gold

B2B audience: Hotel procurement | Hospitality project manager | Interior designer · Cooperation: Contract supply

Keywords: rectangular marble inlay, black rectangular marble inlay, leather rectangular marble inlay, art deco rectangular marble inlay, rectangular marble inlay cairo, rectangular marble inlay dubai, rectangular marble inlay riyadh, rectangular marble inlay wholesale supplier, rectangular marble inlay manufacturer china, oem rectangular marble inlay, private label rectangular marble inlay, rectangular marble inlay contract grade, rectangular marble inlay ff&e procurement, rectangular marble inlay project quotation, rectangular marble inlay container loading, rectangular marble inlay bespoke sizing, amman franchise supply, jeddah hotel project supply, manama bulk wholesale, sharjah dealer programme

Video file: PZY_5795.mp4

How do I apply for regional exclusivity on this rectangular marble inlay?
Our export team replies within one business day with the rectangular marble inlay catalog, tiered pricing and cooperation terms. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
What is your monthly production capacity for this rectangular marble inlay?
Our Foshan plant ships 20+ forty-foot containers a month, so rectangular marble inlay schedules hold even across multi-room hotel rollouts. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
How do franchise partners operate in my region on this rectangular marble inlay?
Franchise partners on the rectangular marble inlay hold regional exclusivity against an agreed annual volume and receive the brand environment, display plan and staff training. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Can this rectangular marble inlay be built to hotel chain brand standards?
We manufacture the rectangular marble inlay to Marriott, Hilton, Accor and IHG style guides, including tolerances, contract-grade upholstery and moisture-rated finishes. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.

Grey Marble Side Table Jeddah Interior Designer Bulk Wholesale

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced round grey Marquina marble side table with sculptural scalloped white veining on polished brass tapered legs, paired with scalloped frosted glass pendant for refined hospitality vignettes. Suited to interior designer specifications, FF&E procurement, and hotel procurement projects across Jeddah, GCC and Mumbai. Regional distribution and OEM private label available.

Product: Round grey marble side table with scalloped pendant light · Material: Grey Marquina marble top with white veining; polished brass tapered legs; scalloped frosted glass pendant · Style: Modern luxury / Contemporary art deco · Colour: Grey with champagne gold

B2B audience: Interior designer | FF&E procurement | Hotel procurement · Cooperation: Bulk wholesale

Keywords: round grey marble, grey round grey marble, marble round grey marble, art deco round grey marble, round grey marble muscat, round grey marble dammam, round grey marble sharjah, round grey marble wholesale supplier, round grey marble manufacturer china, oem round grey marble, private label round grey marble, round grey marble contract grade, round grey marble ff&e procurement, round grey marble project quotation, round grey marble container loading, round grey marble bespoke sizing, manama dealer programme, dubai contract supply, dubai franchise supply, jeddah hospitality fit out

Video file: PZY_5796.mp4

What is the quickest contact route for a quotation on this round grey marble?
Our export team replies within one business day with the round grey marble catalog, tiered pricing and cooperation terms. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
What materials are used in this round grey marble?
The round grey marble is built in grey tones with marble, solid hardwood frames and hand-applied finishes - full material data sheet on request. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Is installation support provided for project orders of this round grey marble?
Project orders of the round grey marble include installation drawings and hardware schedules, plus on-site supervision on large rollouts. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
Which certifications cover this round grey marble?
The round grey marble is produced under ISO 9001 with CE, CARB P2 and FSC documentation issued per order for customs and tender files. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.

Reeded Marble Dining Table Abu Dhabi Hotel Project Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced round Calacatta-style marble dining table with lazy Susan, reeded black lacquer pedestal and brass trim, accompanied by ivory channel-tufted leather chairs with brass sabots. Designed for hospitality project manager specifications, hotel procurement, and interior designer luxury suites across Abu Dhabi, GCC and Mumbai. Bulk wholesale distribution and OEM private label available.

Product: Round marble pedestal dining table with reeded base and ivory leather tufted chairs · Material: Calacatta-style white marble top with grey veining; black lacquered reeded pedestal; brass accent; ivory leather channel-tufted chairs · Style: Modern luxury / Italian art deco glamour · Colour: White marble with ivory cream

B2B audience: Hospitality project manager | Hotel procurement | Interior designer · Cooperation: Hotel project supply

Keywords: round marble pedestal, white round marble pedestal, leather round marble pedestal, art deco round marble pedestal, round marble pedestal riyadh, round marble pedestal doha, round marble pedestal kuwait city, round marble pedestal wholesale supplier, round marble pedestal manufacturer china, oem round marble pedestal, private label round marble pedestal, round marble pedestal contract grade, round marble pedestal ff&e procurement, round marble pedestal project quotation, round marble pedestal container loading, round marble pedestal bespoke sizing, doha ff&e package supply, cairo ff&e package supply, abu dhabi hospitality fit out, dammam contract supply

Video file: PZY_5798.mp4

How do I reach your sales team from Saudi Arabia or the UAE about this round marble pedestal?
Our export team replies within one business day with the round marble pedestal catalog, tiered pricing and cooperation terms. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
How is this round marble pedestal packaged for international shipping?
The round marble pedestal is EPE-wrapped, foam-cornered and crated in export-grade plywood with desiccant, then loaded under a photo loading report. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
What HS code applies to this round marble pedestal for customs clearance?
Upholstered seating clears under HS 9401.61/9401.71 and casegoods under HS 9403.20; the round marble pedestal ships with the full invoice set. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
Do you offer regional exclusivity for distributors of this round marble pedestal?
Exclusivity on the round marble pedestal is granted per country or city against a defined annual volume, protecting your stock, showroom and marketing investment. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.

Black Lacquer Console Doha Office Project Contract Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced sculptural high-gloss black lacquer console table with cantilevered silhouette, paired with executive office desk and high-back black leather task chair on chrome swivel base for luxury hospitality business centers. Engineered for office project contractor, interior designer, and hospitality project manager fit-outs across Doha, GCC and Mumbai. Bulk wholesale distribution available.

Product: Sculptural black lacquer console table with executive office desk and leather task chair · Material: High-gloss piano black lacquered wood; cast brass fittings; top-grain leather chair; chrome five-star swivel base · Style: Modern luxury / Italian sculptural contemporary · Colour: Piano black with chrome silver

B2B audience: Office project contractor | Interior designer | Hospitality project manager · Cooperation: Contract supply

Keywords: sculptural black lacquer, piano sculptural black lacquer, leather sculptural black lacquer, modern luxury sculptural black lacquer, sculptural black lacquer sharjah, sculptural black lacquer manama, sculptural black lacquer amman, sculptural black lacquer wholesale supplier, sculptural black lacquer manufacturer china, oem sculptural black lacquer, private label sculptural black lacquer, sculptural black lacquer contract grade, sculptural black lacquer ff&e procurement, sculptural black lacquer project quotation, sculptural black lacquer container loading, sculptural black lacquer bespoke sizing, riyadh project sourcing, dammam dealer programme, sharjah hospitality fit out, sharjah contract supply

Video file: PZY_5799.mp4

Can I contact the Foshan factory directly about this sculptural black lacquer?
Our export team replies within one business day with the sculptural black lacquer catalog, tiered pricing and cooperation terms. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
How do I arrange a factory visit to see this sculptural black lacquer in Foshan?
Send your travel dates and we arrange airport pickup, a full line tour and sculptural black lacquer testing at our Foshan workshop. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
What is the price range for this sculptural black lacquer at project volume?
Indicative FOB on the sculptural black lacquer runs USD 350-3,500 per piece by size, stone content and upholstery grade, with project pricing at volume. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Do you provide 3D models or BIM files for this sculptural black lacquer?
Yes - SketchUp, 3ds Max and IFC/BIM files for the sculptural black lacquer ship with material schedules so specifiers can close their documentation package. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.

Leopard Velvet Armchair Riyadh Interior Designer Franchise

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced leopard-print velvet accent armchair with polished brass arm caps and tapered legs, staged with matching leopard hide rug and chrome floor lamp against warm walnut paneling for boutique hotel vignettes. Suited to interior designer, hotel procurement, and specifier projects across Riyadh, GCC and Mumbai. Franchise showroom and regional distribution programs open.

Product: Leopard-print velvet accent armchair with matching hide rug · Material: Velvet upholstery; polished brass arm caps and tapered legs; natural leopard hide rug · Style: Contemporary luxury with maximalist glamour / animalier · Colour: Leopard print with champagne gold

B2B audience: Interior designer | Hotel procurement | Specifier · Cooperation: Franchise

Keywords: leopard-print velvet accent, leopard leopard-print velvet accent, velvet leopard-print velvet accent, contemporary luxury leopard-print velvet accent, leopard-print velvet accent kuwait city, leopard-print velvet accent abu dhabi, leopard-print velvet accent jeddah, leopard-print velvet accent wholesale supplier, leopard-print velvet accent manufacturer china, oem leopard-print velvet accent, private label leopard-print velvet accent, leopard-print velvet accent contract grade, leopard-print velvet accent ff&e procurement, leopard-print velvet accent project quotation, leopard-print velvet accent container loading, leopard-print velvet accent bespoke sizing, dubai hotel project supply, dammam ff&e package supply, manama hospitality fit out, manama franchise supply

Video file: PZY_5808.mp4

How do I request samples and pricing for this leopard-print velvet accent at the same time?
Our export team replies within one business day with the leopard-print velvet accent catalog, tiered pricing and cooperation terms. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
How is quality control handled on this leopard-print velvet accent?
Every leopard-print velvet accent order runs three-stage inspection - incoming material, in-process frame check and pre-shipment load test - with a photo report before dispatch. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
What is the FOB port for this leopard-print velvet accent?
FOB Shenzhen or Guangzhou/Nansha is standard for the leopard-print velvet accent, with CIF, CFR and DDP quotes issued on request. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
Can this leopard-print velvet accent ship in a mixed-product container load?
We combine seating, tables, casegoods and lighting with the leopard-print velvet accent in one container, so you carry a full assortment at single-item shipping cost. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.

Peacock Throne Chair Mumbai Hotel Bulk Wholesale Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced peacock-inspired throne chair with radiating velvet feather backrest on polished brass rods, button-tufted velvet seat cushion on coral terracotta base with brass starburst pedestal. Designed for interior designer specifications, hotel procurement, and hospitality project manager lobby statements across Mumbai, GCC and Saudi Arabia. Bulk wholesale and OEM private label programs available.

Product: Peacock throne sculptural accent chair with feather velvet backrest · Material: Velvet upholstery with teardrop feather pads; polished brass rod frame; button-tufted velvet seat cushion; coral terracotta base · Style: Contemporary luxury / Sculptural art-inspired statement seating · Colour: Peacock blue with teal forest green

B2B audience: Interior designer | Hotel procurement | Hospitality project manager · Cooperation: Bulk wholesale

Keywords: peacock throne sculptural, peacock peacock throne sculptural, velvet peacock throne sculptural, contemporary luxury peacock throne sculptural, peacock throne sculptural amman, peacock throne sculptural cairo, peacock throne sculptural dubai, peacock throne sculptural wholesale supplier, peacock throne sculptural manufacturer china, oem peacock throne sculptural, private label peacock throne sculptural, peacock throne sculptural contract grade, peacock throne sculptural ff&e procurement, peacock throne sculptural project quotation, peacock throne sculptural container loading, peacock throne sculptural bespoke sizing, jeddah ff&e package supply, jeddah franchise supply, cairo hospitality fit out, jeddah project sourcing

Video file: PZY_5809.mp4

What contact do you provide for franchise enquiries on this peacock throne sculptural?
Our export team replies within one business day with the peacock throne sculptural catalog, tiered pricing and cooperation terms. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
How do I request a quotation on this peacock throne sculptural for a villa or project?
Send the floor plan or BOQ and we return a room-by-room quotation on the peacock throne sculptural with drawings, lead time and container plan within 48 hours. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
Do you support DDP shipping of this peacock throne sculptural to my country?
DDP on the peacock throne sculptural into Amman is quoted door to door with duties and clearance handled, the preferred route for regional distributors. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
Are replacement parts available for this peacock throne sculptural long term?
We guarantee a 5-year parts supply on the peacock throne sculptural, so showroom samples and delivered projects stay serviceable. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.

Burl Walnut Accent Chair Abu Dhabi Specifier Distribution

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced sculptural burl walnut accent chair with high-gloss lacquered horseshoe frame, ebonized inner trim, and diamond-quilted charcoal grey textile upholstery on rounded drum seat. Suited to specifier projects, interior designer collections, and contract furniture supplier programmes across Abu Dhabi, GCC and Mumbai. Regional distribution and OEM private label available.

Product: Sculptural burl walnut accent chair with diamond-quilted upholstery · Material: Burl walnut frame with high-gloss lacquer; ebonized inner trim; diamond-quilted grey textile upholstery · Style: Contemporary luxury / Italian sculptural modern · Colour: Amber burl walnut with charcoal grey

B2B audience: Specifier | Interior designer | Contract furniture supplier · Cooperation: Regional distribution

Keywords: sculptural burl walnut, amber sculptural burl walnut, walnut sculptural burl walnut, contemporary luxury sculptural burl walnut, sculptural burl walnut jeddah, sculptural burl walnut muscat, sculptural burl walnut dammam, sculptural burl walnut wholesale supplier, sculptural burl walnut manufacturer china, oem sculptural burl walnut, private label sculptural burl walnut, sculptural burl walnut contract grade, sculptural burl walnut ff&e procurement, sculptural burl walnut project quotation, sculptural burl walnut container loading, sculptural burl walnut bespoke sizing, cairo private label supply, dammam project sourcing, riyadh bulk wholesale, cairo oem production

Video file: PZY_5810.mp4

How does an interior studio contact you for this sculptural burl walnut spec sheets?
Our export team replies within one business day with the sculptural burl walnut catalog, tiered pricing and cooperation terms. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
What is the MOQ for a custom colour or finish on this sculptural burl walnut?
Custom colour and finish MOQ on the sculptural burl walnut is 10 sets per model, while stock walnut selections ship from 5 sets. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
How do I become a regional brand agent for this sculptural burl walnut?
We appoint sculptural burl walnut agents by territory under a signed agreement with protected pricing and marketing material in your market language. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Do you provide showroom mockup design around this sculptural burl walnut?
We deliver 2D layout and 3D mockup drawings, then supply the sculptural burl walnut display pieces, lighting plan and signage specification. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.

Brown Leather Modular Sectional Jeddah Hotel Project Supply

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced chocolate brown top-grain Italian leather modular sectional sofa with brushed brass plinth base, channel-tufted seat cushions, and boucle accent pillow, staged in a Corinthian column neoclassical showroom for hotel reference. Engineered for hotel procurement, FF&E procurement, and commercial real estate developer fit-outs across Jeddah, GCC and Mumbai. Bulk wholesale and dealer recruitment programs available.

Product: Brown leather modular sectional sofa with brass plinth base · Material: Top-grain Italian leather upholstery; brushed brass plinth base; boucle wool blend accent pillow; ivory tufted upholstery · Style: Contemporary luxury / Modern Italian with neoclassical architecture · Colour: Chocolate brown espresso with ivory cream

B2B audience: Hotel procurement | FF&E procurement | Commercial real estate developer · Cooperation: Hotel project supply

Keywords: brown leather modular, chocolate brown leather modular, leather brown leather modular, contemporary luxury brown leather modular, brown leather modular dubai, brown leather modular riyadh, brown leather modular doha, brown leather modular wholesale supplier, brown leather modular manufacturer china, oem brown leather modular, private label brown leather modular, brown leather modular contract grade, brown leather modular ff&e procurement, brown leather modular project quotation, brown leather modular container loading, brown leather modular bespoke sizing, muscat hospitality fit out, jeddah private label supply, abu dhabi oem production, jeddah bulk wholesale

Video file: PZY_5811.mp4

How do I get in touch about a container order of this brown leather modular?
Our export team replies within one business day with the brown leather modular catalog, tiered pricing and cooperation terms. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
Which hospitality projects feature a piece like this brown leather modular?
We have supplied 5-star hotel, resort and restaurant fit-outs across the GCC, Africa and Southeast Asia; names on this brown leather modular release under NDA on request. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Can this brown leather modular be specified for restaurant and F&B fit-out projects?
Yes - the brown leather modular can be built contract-grade with stain-, heat- and moisture-resistant finishes for high-traffic venues. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
How do I contact your export sales team about this brown leather modular?
Our export desk answers within one business day with the brown leather modular catalog, pricing and cooperation terms. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.

Brass Snake Side Table Muscat Interior Designer Bulk Wholesale

Original factory footage. (c) 2026 - All Rights Reserved. Factory produced sculptural brass snake-form side table with cognac lacquered tray top on circular foot, paired with emerald green velvet accent chair and brass detailing for art deco hospitality vignettes. Suited to interior designer commissions, specifier projects, and hospitality project manager specifications across Muscat, GCC and Mumbai. Bulk wholesale distribution and dealer recruitment available.

Product: Sculptural brass snake-form side table with cognac lacquer tray top and emerald velvet accent chair · Material: Cast brass sculptural snake-form stem; cognac honey-toned lacquered tray top; emerald green velvet upholstery; brass-tipped tapered legs · Style: Modern luxury / Italian art deco revival with maximalist accent · Colour: Brass gold with cognac amber and emerald green

B2B audience: Interior designer | Specifier | Hospitality project manager · Cooperation: Bulk wholesale

Keywords: sculptural brass snake-form, brass sculptural brass snake-form, velvet sculptural brass snake-form, art deco sculptural brass snake-form, sculptural brass snake-form dammam, sculptural brass snake-form sharjah, sculptural brass snake-form manama, sculptural brass snake-form wholesale supplier, sculptural brass snake-form manufacturer china, oem sculptural brass snake-form, private label sculptural brass snake-form, sculptural brass snake-form contract grade, sculptural brass snake-form ff&e procurement, sculptural brass snake-form project quotation, sculptural brass snake-form container loading, sculptural brass snake-form bespoke sizing, kuwait city bulk wholesale, amman hospitality fit out, manama ff&e package supply, abu dhabi hotel project supply

Video file: PZY_5814.mp4

Where can an importer reach your export department about this sculptural brass snake-form?
Our export team replies within one business day with the sculptural brass snake-form catalog, tiered pricing and cooperation terms. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.
Is showroom viewing of this sculptural brass snake-form available in Dubai or Riyadh?
Partner showrooms in Dubai and Riyadh hold sculptural brass snake-form samples, and we arrange dedicated viewings around INDEX and hotel procurement weeks. Message WhatsApp +86 188 2788 2512 for quotation and regional distribution terms.
How do I become a dealer for this sculptural brass snake-form?
We appoint one dealer per city for the sculptural brass snake-form range, with annual volume targets, a tiered FOB price list and showroom display support. WhatsApp: +86 188 2788 2512 for catalog, pricing, and dealer pack.
What is the minimum order quantity for this sculptural brass snake-form?
MOQ on the sculptural brass snake-form is 5 sets per model, and mixed-model containers let new dealers open the Dammam market with a low entry order. Reach our export desk on WhatsApp +86 188 2788 2512 to start cooperation.

On-Site Hospitality

Coming to Foshan? We Handle Every Detail

✈

Airport Transfers

Complimentary private transfers from Guangzhou Baiyun Airport (CAN) straight to our factory and showroom.

🛎

Hotel Booking

We help secure five-star hotels in Foshan at preferred corporate rates.

☕

Business Dining

Business lunches or authentic Cantonese tea sessions arranged in our showroom lounge.

Book a Visit

Come to Foshan and See It in Person

Share your details and we will match you with a dedicated specialist the same day to agree on a visit date and prepare your itinerary.

* Please note: to safeguard product quality and enable in-depth discussion, we work with partners who visit our Foshan factory in person. Airport pickup and factory tours can be arranged. We do not offer online-only or DDP quotations.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp