The Rosy Rose Buyer’s FAQ: What to Ask Before You Order Custom Furniture

5 9 月, 2026

Every great piece of furniture starts as a conversation, not a checkout. Ask the right questions before you order, and you will walk away with something made for the way you actually live — not something you settled for because it was on a shelf.

Before You Even Look at Fabrics

Can you make it to my custom size?

Yes — almost always. Made-to-order means the frame is built around your measurement, not trimmed to fit one. Alcoves, low ceilings, an oversized double-door entry, a sofa for a corner with a column in the middle: these are the commissions our workshop genuinely enjoys. Send your dimensions, even rough ones, and we will confirm the proportion before a single board is cut.

Do you work from my own drawings or a photo of a piece I love?

We do. Bring a photograph, a magazine page, or a sketch, and our team will translate it into a buildable design in the same materials and Italian-inspired lines we work in daily. The honest caveat: we will not copy another maker’s trademarked design, but we can absolutely deliver the spirit of what you admire.

Can I see a 3D proposal before production begins?

Yes, and we recommend it. For anything beyond a minor size change, you should see the piece rendered from the angles that matter — the front elevation, the side profile, the way a leg meets a frame. This is the point where small misunderstandings get caught and where you can still move an armrest or change a seat depth without cost.

Materials, Honest Talk

Which leathers can I choose?

Full-grain hides are our starting point, and within that we work with Nappa for its buttery softness and aniline leather for a finish that keeps the natural markings of the hide visible. Full-grain keeps the outermost layer of the hide intact, so the piece wears in and softens over years rather than peeling or cracking. Ask for swatches in daylight — leather colour reads very differently under showroom spotlights.

What other upholstery do you offer?

Velvet and bouclé sit alongside our leathers, each with a character of its own. Velvet catches light and suits a formal drawing room; bouclé is the quieter, tactile choice for a relaxed family sofa. We will be straight with you about which fabric is honest for heavy daily use and which is better reserved for a lower-traffic spot.

Which marbles can I have for a top or a console?

We regularly work with Carrara and Calacatta, and we will book-match the marble so the veining flows across the surface like one continuous stone rather than four separate slices. Because each slab is unique, we show you the actual stone before we commit it to your piece. If book-matching matters to you — and it should for a dining or sideboard top — say so early.

Which woods do you build in?

Walnut, oak, rosewood, and macassar are the staples, each offering a different grain and temperament. Walnut warms a room, oak is the workhorse, rosewood and macassar bring the darker, more dramatic figure that suits statement pieces. If you need the wood tone to tie into existing joinery, send us a sample or photograph of what is already in your home.

What about the hardware and metal finishes?

Brushed and antique gold are our signatures, and both can be tuned to sit quietly or shine depending on the piece. Metal finishes are an easy place to save or spend, so be specific about what you picture — a whisper of antique gold can be the difference between a sofa that competes with the room and one that completes it.

The Craft and the Guarantee

How is the price actually set — and what makes one quote higher than another?

Price follows specification, not guesswork. The size of the hide, the grade and cut of the marble, the complexity of the joinery, and the metal finishing all move the number in real, explainable steps. Two sofas that look alike at a glance can differ in cost because one uses a single matched hide and the other a tighter, more forgiving spec. Ask us to walk you through where the money sits in your quote, and you can decide where to spend and where to save with your eyes open.

Is it made entirely by hand?

Every piece is hand-finished — that is the honest and accurate claim. Machine cutting may rough out a frame for speed and consistency, but the final character of the work comes from hand fitting, hand stitching, and hand finishing that a machine cannot reproduce. The difference you will feel is in the seams, the edges, and the way the piece settles. Since 1996 we have worked this way, and we see no reason to change.

What does the ten-year warranty actually cover?

It covers the structural frame of the piece — the quiet promise behind every sofa, chair, and bed we build: the joinery and the frame will hold. Fabrics and finishes wear according to use and care, which is no reflection on the maker, so we keep that distinction honest and clear in writing before you sign.

How long does a made-to-order piece take?

It depends entirely on the scale of the piece and where it sits in the finishing queue — there is no honest single number we can give you that would be true for every order. A small side table moves faster than a full book-matched marble dining suite, and a busy season stretches every wait. Ask for a timeline on your specific commission at the point of order, and we will give you a real estimate for that piece.

Will I know exactly what I am paying for before I approve it?

Yes. We itemise the materials, the finishing, and the specification in writing, and nothing moves into production until you have signed off. If the piece changes in a way that alters cost — a larger hide, a rarer book-matched slab — you hear about it before we proceed, never after.

The Big Picture

Can you supply a whole room, or even a full interior project?

We can, and it is where we shine. Commissioning a complete room at once means the leather, the marble, the wood tones, and the metal finishes are specified as one coherent scheme instead of five separate accidents. It also simplifies your logistics: one point of contact, one delivery plan, one standard of quality across every surface.

Do you ship to my country?

We export across the Middle East, Europe, and the United States, and to more than fifteen countries in total. Every shipment is packed for the distance it travels, and we will be clear about your door-to-door expectations before you commit. If your country is not on that list, ask anyway — we will tell you plainly whether we can serve you.

Can I visit the showroom or factory?

Yes, by appointment, in Foshan, China. We hold a 200,000-square-metre factory and a 10,000-square-metre showroom, and both are open to serious buyers who book ahead. There is no substitute for running your hand over a full-grain hide or seeing how a marble slab takes light in person, and we welcome the visit precisely because it makes the later decisions easier.

Who has been in business since 1996 — and why does that matter to me?

We have been building since 1996, which means we have shipped made-to-order furniture through recessions, shipping disruptions, and every style trend of three decades. A workshop that has lasted that long has solved its problems before you arrive; new makers disappear, while established ones answer to their past work. That is a reassurance no brochure can fake.

What is the single best question to ask any custom furniture maker?

Ask them what happens if it is not right. A confident atelier answers without hesitation — how they fix it, who pays, what the timeline to remedy is. That answer tells you more about the workshop than any showroom photograph, and it is the question we hope every buyer asks, of us or anyone else.

Looking After It Once It Is Home

How do I care for full-grain leather and velvet?

Less is genuinely more. Blot spills rather than rubbing them, keep the piece out of unbroken direct sunlight, and let leather develop its natural patina instead of treating it with conditioners that clog the hide. For velvet, regular light vacuuming with a soft brush keeps it fresh, and we will give you a care sheet specific to your fabric when your piece ships. The right care is simple; the wrong products cause more damage than neglect ever does.

Will marble and wood need special treatment?

Marble asks only that you seal it and wipe up acidic spills — wine, citrus, coffee — without delay, and it will reward you for decades. Wood wants the same respect for extremes of humidity and heat that any fine furniture does. Book-matched marble is a natural stone with natural variation, and part of its charm is that no two homes will own an identical top.

Do you give care instructions in writing with each delivery?

Every commission ships with a written care and cleaning guide matched to its own materials, and for a full-room commission that document becomes part of the handover.

For anything your list did not cover, the simplest path is a direct conversation. Reach us on WhatsApp at +86 186 7570 6957, and we will answer the questions that matter to your project — with straight talk, and without guesswork.

R
ROSY ROSE
Online · Direct from the Foshan factory
👋 Hi, welcome to Rosy Rose Furniture!Just now
We can arrange a factory visit or send you our catalogue — how can we help?Just now
💬 Tap below to continue the conversation with us on WhatsApp